Kitchen and bathroom remodel cost in Las Vegas (2026)
A bathroom remodel averages about $15,586 and usually runs $6,456 to $24,715. Kitchens cost more: the 2025 Cost vs. Value report puts a midrange minor kitchen remodel at about $28,458 and a midrange major remodel at about $82,793, and upscale kitchens can pass $160,000.
Typical prices
| Project | As low as | Average | As high as |
|---|---|---|---|
| Bathroom remodel | $6,456 | $15,586 | $24,715 |
| Bathroom refresh (about 50 sq ft) | $8,478 | â | $10,883 |
| Mid-range bathroom (about 50 sq ft) | $14,609 | â | $19,040 |
| High-end bathroom (about 50 sq ft) | $27,492 | â | $35,808 |
| Minor kitchen remodel, midrange | â | $28,458 | â |
| Major kitchen remodel, midrange | â | $82,793 | â |
| Kitchen remodel, minor midrange to major upscale | $28,458 | â | $164,104 |
These figures are published ranges and averages from national cost guides, listed under Sources, shown so you know what to expect. They are not quotes or price limits. A dash means the guide doesnât publish that figure. The company that does the work sets the price after seeing the job.
Which remodels pay back when you sell
Smaller, well-chosen updates usually return more of their cost at resale than full luxury remodels. In the 2025 Cost vs. Value report, as summarized by HomeLight, a midrange minor kitchen remodel (new cabinet fronts, counters, sink, appliances and flooring in the same layout) added about 113% of its cost to resale value. An upscale major kitchen remodel recouped about 36%.
- Remodeling to enjoy the home for years is a fine reason to spend more. Just donât count on getting it all back at sale.
- Keeping the layout, with plumbing and gas lines where they are, is the single biggest way to control cost.
How to budget
- A common rule of thumb for kitchens: about one-third for cabinets, one-third for labor, and one-third for everything else, like counters, appliances, sink, backsplash and flooring.
- Keep a contingency of 10% to 20% for whatâs found behind walls and under floors, like old leaks or outdated wiring.
- Order long-lead items, like cabinets, windows and special tile, before demolition starts, so the room isnât torn out while you wait.
- Price the finishes you actually want. Allowances in a bid are often set low.
When a remodel needs a permit
- In the City of Las Vegas, painting, cabinets, countertops, floor covering and similar finish work donât usually need a permit.
- Moving plumbing, moving or removing walls, or turning a garage into living space does.
- Electrical and mechanical changes generally need permits too.
- Henderson, North Las Vegas and Clark County each have their own building departments.
Unpermitted work can come up when you sell, and it can complicate insurance claims. Ask who pulls the permits and schedules inspections, and get copies.
What a good remodel contract includes
- A detailed scope, drawings if layout changes, and a list of finishes by brand and model, or clear allowance amounts.
- A timeline with start and finish dates and what happens if they slip.
- A payment schedule tied to finished stages of work, not dates.
- How change orders are priced and approved, in writing, before the work is done.
- Who handles permits, inspections, cleanup and dumpster.
- Workmanship warranty and the contractorâs license number.
Red flags
- A large deposit before any work or materials, or cash-only pricing.
- A bid far below the others with vague allowances.
- No written contract, or a contractor who suggests skipping permits.
Hiring a remodeler in Nevada
Whole-room and home remodels are generally done under a general building license, such as B-2 residential and small commercial or B-7 residential remodeling. Look the company up on the Nevada State Contractors Board website.
Hiring a licensed contractor also protects you. If a licensed residential contractor fails to do the work properly on the single-family home you live in, the Nevada State Contractors Boardâs Residential Recovery Fund can pay up to $40,000 per claim after other ways of recovering the money are used up. Claims are generally due within four years of the work. Unlicensed contractors arenât covered.
Why your price can be higher or lower
- The company: design, project management, crew, licensing and warranty.
- Scope: refresh, mid-range update or full gut.
- Layout changes that move plumbing, walls or electrical.
- Finishes: cabinets, counters, tile and fixtures.
- Permits, design fees and HOA rules.
Find local remodeling contractors in the BookTheFix Contractor Directory.
Sources
- This Old House: Bathroom remodel cost
- HomeLight: How much does it cost to remodel a kitchen? (citing the 2025 Cost vs. Value report)
- City of Las Vegas Building & Safety: When do I need a permit?
- Nevada Administrative Code, Chapter 624: contractor license classifications
- Nevada State Contractors Board: Residential Recovery Fund overview
This article is general information for homeowners. Every home and system is different, so have a licensed professional evaluate yours before making repair or replacement decisions.